Murrembeena Train Station.
The first stones are now up. Image Paving and #khdkandscapes are installing some 300mm high coursed #Bluestonepanels with a bed thickness of 30mm. The stone are being mechanically fixed with @stoneclip 8mm Adjustable panels back to s structural steel frame. Each clip has 2 14 gauge series 500 screw that are self cutting to aid in the installation. http://levelcrossings.vic.gov.au/crossings/murrumbeena-road-murrumbeena Call Dan 0403 679 998
[super_form id=”367″]